Update cr.44net.ch/baseimages/debian-s6 Docker tag to v11 #28

Merged
olofvndrhr merged 1 commit from renovate/cr.44net.ch-baseimages-debian-s6-11.x into master 2022-11-26 23:00:23 +01:00
Collaborator

This PR contains the following updates:

Package Type Update Change
cr.44net.ch/baseimages/debian-s6 final major 1.3.6-linux-arm64 -> 11.5.5-linux-arm64

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, click this checkbox.

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [cr.44net.ch/baseimages/debian-s6](https://git.44net.ch/44net-assets/docker-baseimages-build.git) | final | major | `1.3.6-linux-arm64` -> `11.5.5-linux-arm64` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, click this checkbox. --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzMi4xNTkuNCIsInVwZGF0ZWRJblZlciI6IjMyLjE1OS40In0=-->
renovate-bot added 1 commit 2022-11-16 20:04:33 +01:00
Update cr.44net.ch/baseimages/debian-s6 Docker tag to v11
Some checks failed
ci/woodpecker/push/tests Pipeline was successful
ci/woodpecker/pr/tests Pipeline was successful
ci/woodpecker/pr/test_tox_arm64 Pipeline failed
ci/woodpecker/pr/test_docker_arm64 Pipeline failed
ci/woodpecker/pr/test_docker_amd64 Pipeline was successful
ci/woodpecker/pr/test_release Pipeline was successful
ci/woodpecker/pr/test_tox_amd64 Pipeline was successful
078153ae8c
renovate-bot force-pushed renovate/cr.44net.ch-baseimages-debian-s6-11.x from 078153ae8c to e9a6edbad0 2022-11-17 00:05:01 +01:00 Compare
renovate-bot force-pushed renovate/cr.44net.ch-baseimages-debian-s6-11.x from e9a6edbad0 to 7181ab4b33 2022-11-18 00:04:55 +01:00 Compare
olofvndrhr merged commit 51989c5f39 into master 2022-11-26 23:00:23 +01:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: olofvndrhr/manga-dlp#28
No description provided.